Jake Thomas Elevated Water Tank
Pigeon Forge, Tennessee
SSR provided engineering design and construction phase services for the Jake Thomas Elevated Water Tank and Booster Station. The 250,000-gallon elevated tank is located in the northwest corner of the Ripken Complex and includes approximately 1,500 LF of 12-inch water line as well as a new 200 GPM booster pump station. The project was completed in 2016 and features an artistic paint treatment due to its prominent location in the baseball complex.
Owner
- City of Pigeon Forge
Project Completion
- 2016