google-site-verification: googleac31132f3d1837d9.html

Projects • Jake Thomas Elevated Water Tank

Jake Thomas Elevated Water Tank

Pigeon Forge, Tennessee

SSR provided engineering design and construction phase services for the Jake Thomas Elevated Water Tank and Booster Station. The 250,000-gallon elevated tank is located in the northwest corner of the Ripken Complex and includes approximately 1,500 LF of 12-inch water line as well as a new 200 GPM booster pump station. The project was completed in 2016 and features an artistic paint treatment due to its prominent location in the baseball complex.

Owner

  • City of Pigeon Forge

Project Completion

  • 2016

Market

Project Size

  • 0.25 MG