google-site-verification: googleac31132f3d1837d9.html

Projects • Center Point Road 30-Inch Water Transmission Main

Center Point Road 30-Inch Water Transmission Main

Hendersonville, Tennessee

SSR provided start to finish engineering services for this 30-inch DIP water main in Hendersonville, TN. The length of the water main was 6,200 LF. The design of the line required a portion to be restrained joint construction. The water main was mostly installed using the open cut process in private easement along Center Point Road. Included in the design were three creek crossings and one bore crossing of Goshentown Road. The project also included new water services to be connected on the existing 16-inch DIP water line; including copper service line and meter assembly for each resident within the area of work. Fire hydrant assemblies along the route were also replaced. Due to heavy traffic along Center Point Road, traffic control was necessary at certain tie-in locations. It was a project requirement to maintain active water service throughout the construction period, other than when a special exception was made for specific tie-ins, or conversions to a new service. SSR also provided construction engineering inspection services for the project.

Owner

  • White House Utility District

Project Completion

  • 2011

Market

Project Size

  • 6,200 LF

Service Provided