Power, Electrical Equipment for Hospitals
When designing backup, standby, and emergency power systems for hospitals, there are several considerations beyond NFPA 70: National Electrical Code and other building code requirements that must be addressed. Engineers need to be mindful of the construction process, and ensure equipment replacement is coordinated, temporary power strategies are identified, and phasing concepts are developed.
This is a continued discussion from a Consulting Specifying Engineer education session co-presented by Dave Stymiest, PE, CHFM, CHSP, FASHE, (SSR) and Richard A. Vedvik, PE, (IMEG Corp).
View Article