google-site-verification: googleac31132f3d1837d9.html

Blog Post Content

2014 Grand Award Winners

|

Wolf River Boulevard Connector
The final segment of Wolf River Boulevard consists of approximately two miles of four lane roadway with shoulders and bike lanes, two bridges with protected pedestrian crossings, five oversized box culverts, one pedestrian underpass, and two new traffic signals. Wolf River Boulevard is enrolled in Audubon International’s Silver Signature Sanctuary green certification program. The program blends wildlife habitat conservation, water use efficiency, water quality preservation, and other areas of environmental protection with human use of the project. In August 2013, Wolf River Boulevard was the first roadway in the world awarded Silver Certification for accomplishments in sustainable design, construction, and management.

View Article